By Jason Charles Guck, Business Development, Delta Edge CI

Every pre-winter energy conversation starts with the equipment. The boiler, the rooftop units, the controls. That is where the capital is, so that is where the attention goes.

Meanwhile the building has a hole in it, and the hole is open all winter.

Envelope work is the least interesting item on any facilities list. It involves doors, weatherstripping, dock seals and dampers rather than anything that arrives on a truck with a nameplate. It is also the work with the shortest payback available to most operators, and the window for doing it closes when the first cold week arrives.

Three things are worth your time this month. None of them require a capital request.

First, the scale of the thing

Infiltration is unglamorous enough that it rarely gets measured, which is exactly why it persists. The research that does exist is consistent about the order of magnitude.

A NIST study of United States office buildings, using infiltration correlations in EnergyPlus, estimated that infiltration accounts for roughly 15 percent of total heating energy and about 4 percent of cooling energy. The same work indicated that tightening envelopes by 25 to 50 percent could produce heating savings on the order of 26 percent. Earlier simulation work put the heating share closer to 18 percent, and a separate study of modern well-insulated offices suggested infiltration can reach 25 percent of heating load in buildings where everything else has already been improved.

Treat those as a range rather than a target. They come from office buildings, and your building type matters. The useful conclusion is not the precise percentage. It is that a cost most operators have never quantified sits somewhere between a sixth and a quarter of the heating bill, and the measures that address it are cheap.

Doors

Start with the ones people use, because they fail in ways nobody reports.

A door closer that has drifted out of adjustment leaves a main entrance standing open for several seconds on every cycle. In a building with heavy foot traffic that is a continuous opening during the busiest hours of the day. Nobody files a work order about it, because the door still closes eventually and the problem looks like weather rather than equipment.

Walk every exterior door on a cold morning and check four things. Does the closer pull the door fully latched without assistance. Is the weatherstripping intact along both jambs and the head, or has it compressed flat. Does the sweep make contact with the threshold across its whole width. Can you see daylight anywhere around the frame.

Then look at the doors nobody uses. Rarely opened exterior doors are where failed weatherstripping goes unnoticed for years, because the only person who would notice is someone who opens the door.

Vestibules deserve their own check. A vestibule only works if both sets of doors are never open at the same time, and the usual failure is a propped inner door that defeats the entire design. That is a behaviour problem with an equipment cause, which normally means a closer that is too stiff for comfortable use.

Docks

For anyone running a warehouse, a distribution site, a food processing plant or cold storage, this is the largest single opening in the building and the one most likely to be standing open right now.

It is worth understanding how dock doors are treated in energy modelling, because the assumption reveals the lever. Department of Energy analysis performed at Pacific Northwest National Laboratory models loading dock door infiltration at 0.40 cubic feet per minute per square foot of door area, and models it as occurring only when a truck is in place.

That second half is the part that matters. The model assumes the door is closed when no trailer is docked. In practice that assumption fails constantly. Doors stay open between deliveries, during shift changes, and through quiet afternoons because closing them is an extra step and nobody has been told it costs anything.

Three checks:

  • Seals and shelters. Compression seals flatten and tear. A seal that no longer contacts the trailer on all three sides is leaving a gap the full height of the door, and a torn head curtain leaves one across the top.
  • Dock levelers. The pit below a leveler is often a direct path to outside air. Perimeter seals and under-leveler weatherstripping are routinely missing entirely rather than merely worn.
  • Open-door time. This is the cheapest measure in this article and the hardest to hold. It costs nothing and requires somebody to own it.

If the site runs refrigerated space, the same opening works against you in both directions and the economics are better still. I covered the wider picture for those buildings in the piece on winter operations for food service sites, where the door discipline problem shows up in a different form.

Dampers

This is the one that costs the most and shows up the least, because the failure is invisible from the ground.

An economizer brings in outside air when outside air is useful for cooling. It is a genuinely good piece of engineering when it works. The field evidence on whether it works is not encouraging.

Research presented to the American Council for an Energy-Efficient Economy summarised four field studies across California and the Northwest covering more than 500 packaged rooftop units, and found outside air economizers displayed problems in 64 percent of units. A separate ACEEE paper compiling contractor surveys and earlier studies reported figures ranging from roughly 30 to 43 percent for disabled economizers or damper faults, up to 80 percent for existing rooftop units in one study. The numbers vary with sample and with what counts as a failure. The direction does not.

A damper stuck open in January is a heating system conditioning outdoor air on purpose, all day, every day, with no alarm and no complaint. A damper stuck closed is a ventilation problem rather than an energy one, and it will not show on a bill at all.

The check is physical and takes minutes per unit. Open the economizer section. Command the damper through its full travel and watch it move. Confirm the actuator linkage is connected rather than seized, slipping or disconnected entirely. Verify the outside air temperature sensor is reading something plausible, because a failed sensor produces a damper that is technically working and behaving wrongly.

Do this before the heating season rather than during it. A unit that has sat in cooling mode since spring has had six months to fail quietly.

Why this month specifically

Two reasons, one practical and one about cost.

The practical one is access. Sealing work, actuator replacement and door adjustment all go faster in mild weather, and the trades who do it are easier to schedule before the first cold snap fills their calendar.

The cost reason is that winter is no longer a season where the grid has spare room. The emergency order that ran across the PJM region this week arrived in October, during what used to be the quietest stretch on the calendar, and I wrote about what that signals earlier in the week. Load that a building does not draw is the only load that is reliably free, and reducing a heating load reduces it during exactly the hours the system is tightest.

What to do this week

  • Walk every exterior door on a cold morning. Check closer adjustment, weatherstripping, sweeps and visible daylight. Include the doors nobody uses.
  • Inspect dock seals, shelters and leveler perimeters for contact and tears. Assign open-door time to a named person per shift.
  • Cycle every economizer damper through full travel and confirm the linkage and the outside air sensor. Log which units failed, because that list is next year’s maintenance plan.
  • Price the fixes before requesting anything. Most of this is labour and parts measured in hundreds rather than thousands, which means it usually belongs in an operating budget rather than a capital one.

The bottom line

None of this is sophisticated, and that is the reason it stays undone. Work with no nameplate and no vendor presentation attached does not compete well for attention against a proposal with a payback table.

It does compete well on return. A door closer adjustment, a dock seal and a reconnected damper actuator cost very little and run every hour of the heating season without anybody managing them. If you are going to evaluate a larger proposal this winter, do this first, because it changes the baseline the proposal will be measured against. The questions worth asking about that proposal are set out here.

Figures cited are from published research on office and commercial building stock and describe ranges rather than any individual building. Your own numbers come from your own site. If you want a walkthrough of where your envelope and controls are giving heat back to the outside, that is work we do at Delta Edge CI.


About the author. Jason Charles Guck works in business development at Delta Edge CI, an energy conservation intelligence firm serving commercial and industrial operators. He writes on commercial energy costs, utility rate pressure and grid policy. Read more articles by Jason Guck.